This document describes how to migrate data from Alibaba Cloud Database (RDS) to Tencent Cloud's TencentDB using the data migration tool DTS provided by Tencent Cloud.
Alibaba Cloud CVM MySQL 5.6 or earlier version.
Tencent Cloud TencentDB MySQL 5.6 instance.
Note:
Public network addresses provided by Alibaba Cloud need to be converted to IP addresses. Here is an address for querying IP/server address.
Note:
You need to activate a IP whitelist for external mapping by TencentDB in Alibaba Cloud. Otherwise, the connectivity test fails.
For example:
- For the mapping of Tencent Cloud's MySQL with public IP, you need to add the corresponding public IP to Alibaba Cloud's whitelist.
- For "direct connect" or "VPN" database configured in DTS configuration, an IP for external mapping will appear after the task is generated. You must add the IP to Alibaba Cloud's whitelist.
Select TencentDB instance for the destination instance type and enter the link information of the destination database.
Select the database to be migrated, and then create and check migration task information.
Select a data test type. (Choose from whole test or no test.)
Note:
The test ratio fields are required for certain test items.
After a migration task is created, verify the task information. Click Next Step: Verification Task to verify it. You cannot start the task until all the verification items pass. Click Start to complete the process.
There are three statuses for task verification:
Once the verification passes, you can click Start Migration to start the migration right away. Note that if you have set a specified time for a migration task, the task will be queued and executed at the specified time. Otherwise, it will be executed immediately.
When the migration is started, you can see the corresponding migration progress information under the migration task. Required migration steps and the current stage will be displayed if you move your cursor over the exclamation mark following the steps.
Note:
Due to system design limitations, multiple migration tasks submitted or queued at the same time will be performed serially based on the queuing time.
To cancel an in-progress migration task, click the Cancel button.
When the migration is 100% complete, click the Finish button on the right to complete the migration.
Note:
While the migration is in a status of Unfinished, the migration task will continue, so will the database data synchronization.
Was this page helpful?