tencent cloud

TencentDB for PostgreSQL

Multi-Task Conflict Check

フォーカスモード
フォントサイズ
最終更新日: 2024-11-04 10:23:49

Check Details

In PostgreSQL synchronization tasks, ring links are not supported during task configuration. If a ring link exists, the verification task will report an error. If the source end synchronization object has multiple tasks, an alarm will be triggered. Check whether the task configurations are reasonable.

Fixing Method

Follow the interface prompts to cancel tasks that have loopback or duplicate synchronizations, and then perform the verification task again.

ヘルプとサポート

この記事はお役に立ちましたか?

フィードバック